The hub will combine two lines of the Moscow Metro (Line 7 and the Big Circle Line), Line 2 of the Moscow Central Diameters (MCD) and 23 routes of the surface transport. Moreover, the hub will make rides more convenient for over 100 thousand passengers.
Thanks to the new hub, the Tekstilschiki station (Line 7) will become freer by 20%, and the southern areas of Line 7 and Line 10 will be unloaded by 20% as well.